2012 Blacktop Construction Project Photo Album

July 31st – Aug. 15, 2012

We give thanks to God for a special steward of our parish, the late Dr. Fred Barry. He very kindly gifted a part of his estate to the parish school to enhance its surroundings. We are deeply indebted to him for his generosity and thoughtfulness in planning his estate and gifting a portion of it to our parish school. Three projects are made possible as a result of his gift:
1. Replacement of all the gas lines.
2. Improving the phone system and laying down conduit to connect all the different buildings on the campus.
3. Repaving the entire parking lot in the school and church areas.

These pictures were taken in intervals as construction began on the repavement of the parking lot on July 30th, 2012 to the completion on August 15th, 2012.

View Gallery Images

Print Friendly, PDF & Email